Supply & Installation Of Aerosol Based Fire Detection And Suppression System Cartridge For Sg Ac Coaches. As Per Rdso Letter El/7.1.108/Mssbc/Main Dt.12.05.2022, One Coach Set Material Should Be Consists Of 1 No. Of Minimum 40 Gm For Power Panel, 2 Nos. Of Minimum 15 Gm For Rmpu Control Panels, 01 No For Each Panel, And 1 No. For Minimum 10 Gm For Inverter Panel. Technical Para As Per Annexure-G1 Of Rdso Specn. Rdso/Pe/Spec/Ac/0192-2018 (Rev.1) And Approved Make As Per Rdso Letter El/7.1.108/Mss Bc Dt.17.09.2021. Specification And Location Of Fitment Should Be As Above And Mentioned In Above Refere Nce Letter Or Any Latest Instruction From Rdso/Rly.Bd. [ Warranty Period: 30 Months After The Date Of Deli Very ] ]